Monday, June 30, 2008

Wiring

Spent the weekend tracing all the wiring for the second and third
floor. All the old stuff is on the same circuit.

Tuesday, June 24, 2008

Now what?

We've finally got all of the demo done.

Monday, June 23, 2008

Out the window

We threw all of the trim out the window so we wouldn't have to carry
it through the house.

Monday, June 9, 2008

Two trips to the landfill (so far)

From our project we have produced two truckloads of waste. Each trip
across the scales (pictured below) cost about $30. I estimate that we
have one load left.