Third Floor Remodel
Sunday, October 19, 2008
view from third floor window
This is our backyard, now that the shed is gone.
DSC_8611.NEF
Sarah and Clint
From here, you can see several of the sub-projects that we have going on now. 1) insulation on far wall, 2) wall sconces, 3) styrofoam rafter channels mostly installed 4) floor repair still underway
DSC_8608.NEF
Temporary lighting
This track will be on the ceiling once it's installed.
DSC_8604.NEF
Sarah stapling insulation
DSC_8589.NEF
Insulating walls
DSC_8578.NEF
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)
Blog Archive
►
2009
(1)
►
January
(1)
▼
2008
(36)
▼
October
(5)
view from third floor window
Sarah and Clint
Temporary lighting
Sarah stapling insulation
Insulating walls
►
September
(5)
►
August
(1)
►
July
(7)
►
June
(5)
►
May
(13)
Contributors
Sarah
clint